Central Hersonissos Hotel

Central Hersonissos Hotel

Installation of Heat Pump for Hot Water (DHW).

Removal of an oil boiler in the hotel which used it for the production of Hot Water through an alternator in the boiler and an outdated solar field with a plate alternator.
We replaced the oil boiler with a high temperature heat pump (80οC) so that it can protect the circuit from legionella.
The obsolete solar field has been replaced with new solar panels for better use of solar energy.